Longleaf & IronCall (409) 555-0163

Homes · Barndos · Shops · Sam Rayburn

Big house. Bigger shop.

On your land, with our own crew. One fixed price before the slab. Pick what you're building and we'll price it, or start with a free walk of your land.

A black steel barndominium with a cedar-post porch and a roll-up shop door, on a red clay drive in the pines

Build yours

What are we putting on your land?

A charcoal steel shop with two white roll-up doors and a lean-to sheltering a boat, on a red clay drive in the pines
A white barndominium with a wraparound porch on cedar posts and a roll-up shop door at one end, by a lake in the pines
A brick story-and-a-half house with three dormers in a dark metal roof and a long front porch, red clay tracked onto the drive

To scale, beside a full-size pickup

pickup, for scale40 ft wide
Size (feet)
Door height

40×60 shop · 2 doors, 14 ft tall · 2,400 sq ft under roof

Send me a price on this

Example builds. The drawing is to scale from the front. A real price comes after we see your land: the slab, the doors, and the finish-out move it most.

A lake house with a green metal roof and a screened porch up the slope in the pines, a wooden dock and a concrete boat ramp at the shore

Lake lots

Not every foot of a lake lot takes a house.

  1. 164.4 ftNormal lake levelThe top of the conservation pool. Where the water usually sits.
  2. 179 ftThe easement lineUp to about here, the Corps holds a flowage easement on most lake lots. You own the land, but it can flood on purpose. Higher up the lake it can run to 189 ft.
  3. No houseBelow the lineNo house, trailer, or RV to live in, and no filling or reshaping the ground. A fence has to let water through.

We find your line on the plat before anybody draws a house. If your build touches the easement, the Corps of Engineers needs a shoreline use permit first. Walk the lot with us

The price

One number. Before the slab. In writing.

No "we'll see how it goes." Here's what moves the number, so nothing on the bill is a surprise.

01Size and eave height
Every foot taller is more steel and more sheeting, all the way around.
02Doors
Count, width, and height. A 16-foot door needs a taller building to hold it.
03Slab
Thickness and footings, set by what's parked on it. A tractor isn't a bass boat.
04Insulation
Bare steel sweats when warm, damp air hits it. Down here, that's most of the year.
05The finish-out
On a barndo or a house, the inside: cabinets, counters, floors, fixtures. Pick them before you sign.

Who shows up

The guy who quotes it answers the phone.

A red-iron steel frame standing on a new slab with plumbing stubs, red clay around it and pines behind
  1. 01One fixed price, before the slabLine by line, in writing. If you change something, you see the new price and sign it before we build it.
  2. 02Our own crewSlab, steel, and framing are our people. The same foreman runs your job start to finish, and you have his cell.
  3. 03We talk to your lenderBarndos can be tough to appraise. We send your bank the line-item cost sheet and the plans, up front.

On Google

Your real Google reviews show here. These are sample cards.

The Google rating and review count show here

  • Sample review

    ★★★★★

    Real reviews from the builder's Google profile show here, word for word, with the reviewer's name and the date.

    Sample reviewer · Sample date

  • Sample review

    ★★★★★

    Google returns up to five reviews, in its own order. Nothing is edited, shortened, or picked.

    Sample reviewer · Sample date

  • Sample review

    ★★★★★

    The star rating and total count come straight from Google, with a link to read every review.

    Sample reviewer · Sample date

Start here

Let's walk your land.

Free, about an hour. Where it sits, how the water runs, where the septic goes, where power comes in, and on a lake lot, where your line is. Then we price your build.

Rather just talk? Call (409) 555-0163

Straight answers

Can you build on my lake lot?

Usually, yes, above the line. On most Rayburn lots the Corps holds a flowage easement up to about 179 feet: no house below it, and no fill. We find your line on the plat before we draw anything, and if your build touches the easement, the Corps needs a shoreline use permit first.

Can my bank finance a barndominium?

Plenty do, but ask before you pay for plans. The appraisal is the usual snag: there aren't many barndo sales to compare against. We send your lender the line-item cost sheet and the plans so the appraiser has something to work from.

Do I need a permit for a septic system?

Yes. A new septic system needs a soil test, a design, and a permit from the county's authorized agent, and it goes in before the house is finished. It's one of the first things we look at on a land walk.

Do I need to insulate a shop?

If you'll ever heat it, cool it, or park anything you care about in it, yes. Bare steel sweats when warm, damp air hits it, and it drips on whatever's underneath.

Are home builders licensed in Texas?

Texas doesn't license home builders. The trades inside are licensed: electricians and A/C techs by TDLR, plumbers by the State Board of Plumbing Examiners. Ask any builder who's doing that work. Ours are licensed for it.

How long does it take?

A shop goes up a lot faster than a house. You get a schedule with the contract, and the foreman texts you when it moves.

Demo site designed by DIVE